The Parameter"Exported Power Site" on site level is a derived one.


This parameter isdirectly linked and actually mirrors the values of a primaryparameter called "Power PCC" on PCC level. The primaryparameters all have the real time monitor option  ("Monitor"icon) with which you can view the real time values received from theregister of the controller.

The "Power PCC"parameter is directly monitored from Inaccess' controller and itsvalues come from the Multimeter installed on PCC level.

If there is no Multimeter PCC installed at site, then the "Exported Power Site" is calculated according to the priority

1. Substation Meter (sum)

2. Inverter Meter (sum)

3. Inverters (sum)